Executive summary
This task describes and compiles the results of the first task of WP6 thus deals with the ex-post evaluation of the demonstrations of the COORDINET project. This deliverable includes an evaluation of the tested combinations of products for grid services and coordination schemes for each demonstration site, in terms of technical, economic and social KPIs, as identified in WP1. In this document a summary of the calculated KPIs as resulted from all demonstration sites in the three countries, namely Spain, Sweden and Greece is presented.
The obtained KPI results gathered from all demo sites led to a profound analysis carried out from the perspective of each demo separately, taking into account their special network characteristics and peculiarities. This assessment paves the way to a deeper understanding of how the flexibility mechanisms can be well exploited from the network operators through several suitable market model schemes in order to alleviate different types of network problems. In this front, the technical, economic, environmental and social KPIs were used to quantify and evaluate the impact of the tested solutions in different demonstration sites with different network characteristics. Moreover, KPIs showing the progress of the demonstrations during the project execution were utilized. [...]


IIT Project: Coordinet (Coordinet)

Funding entity: Comisión Europea. Horizon 2020 – Cooperation / Energy

Publication date: 05-09-2022